Using and Administering

Keywords Supported for Parallel Jobs

LoadLeveler 2.1.0 includes a new scheduler, the Backfill scheduler, in addition to the default scheduler which existed in LoadLeveler 1.3.0. See Table 4 for a list of which keywords associated with parallel jobs are supported by each scheduler.


[ Top of Page | Previous Page | Next Page | Table of Contents | Index ]